Machine screed · Sesvete, Zagreb
A flat floor starts with good screed.
We lay machine-mixed cement screed for family houses, residential buildings and larger interiors, with our own screed pump, laser levelling and a crew that knows the job. Call us to book a date.
5.0 on Google · 19 reviews
- 5.0Google rating (19 reviews)
- 2024founded in Sesvete
- Our ownscreed pump and vehicle
- Laserlevels set with a rotating laser

Machine screed ·
Screed is the layer you never see but feel every day.
Tiles, parquet and laminate can only lie as flat as the screed beneath them. That is why we do it by machine: sand, cement and water are mixed on site and pumped straight into the room, and the height is set with a laser. You get an even base without waves, ready for the final floor.
Buildings ·
From a family house to a whole building

Family houses
New builds and renovations: screed on every floor, before tiles, parquet or laminate.

Residential buildings
Multi-storey new builds with many flats. We arrive with our own pump and materials on pallets.

Large spaces
Business premises and large rooms, where a big flat surface needs a laser and a machine.
Process ·
Screed in four steps
- 01
Call
Tell us the location, the square metres and when you need the screed.
- 02
Agree
We agree the thickness, site access and the date, and you get a quote.
- 03
Lay
We bring the pump and materials, mix on site and lay to the laser.
- 04
Dry
You get advice on curing and drying before the final floor goes down.
Projects ·
From our sites
Photos from our real jobs, taken from our Facebook page.



Equipment ·
We arrive equipped
We have our own screed pump, a tipper van and a rotating laser level. We don't depend on anyone else's equipment or anyone else's schedule.
Screed pump
Mixes on site and pushes the mix through a hose into the rooms and up to the floors above.
Laser level
A rotating laser on a tripod sets the same floor height throughout the building.
Tipper van
Our white van with the FIDA GLAZURE lettering brings the equipment and the crew.

5.0 out of 5 on Google
Our clients have left 19 reviews. Read them on our Google profile.
Building or renovating? Get in touch early.
Screed comes after the installations and plaster and before the floors. Call us as soon as you know a rough date so we can keep a day for you.