How we work
From the first call to a flat floor
What happens before, during and after screeding, and what you can prepare so it all goes quickly.
Process ·
Five steps
1. Get in touch
Call +385 92 297 6690 or +385 91 561 0373, or send an e-mail. Tell us where the building is, roughly how many square metres, and when you need the screed.
2. Agreement and quote
We agree the thickness, access for the van and pump, a place for sand and cement, and the date. You get a quote.
3. Preparation and levels
On the day, we check the base and use the laser level to set the finished floor height in every room.
4. Machine laying
The pump mixes sand, cement and water on site and sends the mix through a hose into the rooms. We spread and level the screed to the set height.
5. Curing and drying
You get advice on ventilating, when you can walk on it, and when to measure moisture before the floors go down.
Preparation ·
What is usually finished before screeding
Every building is different, so we go through these points together when we agree the job.
- Windows and exterior doors fitted, so the building is closed
- Plaster finished on the walls
- Floor installations laid (electrics, water, drains, heating)
- Floor insulation laid, if it is planned
- Access for the van and pump, and room for sand and cement near the building
- A water connection on site

Rule of thumb ·
How long does screed take to dry?
A common rule of thumb for cement screed: you can usually walk on it after a few days, and drying takes roughly one week per centimetre of thickness in good conditions. In the first days it should be protected from draughts, direct sun and frost, and then aired regularly. Before parquet and other sensitive floors, moisture is measured, not guessed. We give you exact advice for your building.

FAQ ·
Frequently asked questions
How far ahead should I call?
The earlier the better. As soon as you know when the installations and plaster will be finished, call us to book a day.
Do you take on smaller jobs?
We work on family houses, apartment buildings and larger spaces. For any job, call us with the area and we'll tell you how and when we can do it.
Where do you work?
We are based in Sesvete, Zagreb. Tell us where your site is and we'll arrange it.
How thick does the screed need to be?
It depends on the installations and insulation below and on the final floor. In houses it is usually a few centimetres. We agree the thickness for your building before we start.
How much does it cost?
The price depends on the area, the thickness and access to the site. Send us those details and you'll get a quote.
Do I need water on site?
Yes. Machine screed is mixed on site, so a water connection is needed, plus room for sand and cement and access for the vehicle.
When can I lay tiles or parquet?
Only when the screed is dry enough. For parquet and other sensitive floors the moisture is measured. We give you a rough timeline after the job.
Anything else you'd like to know?
Calling is quickest. We're happy to explain.